Accra Sky Train Project Hampered By COVID-19 Pandemic – Railways Ministry Laments

The Ministry of Railways Development, Ghana and its South African counterparts, remain strongly committed to the Accra Sky Train Project.


Contrary to media reports suggesting that the project is a fiasco, both the Ministry of Railways Development and the Government of Ghana on one hand, and the South African Investors, are eager to get the project started.


But the coronavirus pandemic has posed a stumbling block on the commencement of the Sky Train Project.
The agreement for the Accra Sky Train Project was signed in November 2019.


Per the agreement, the investors, who are South Africans, were supposed to visit Ghana to conduct the final feasibility study based on which both parties will get the necessary approvals for the project to start.


The required approvals are to be obtained from the Public Procurement Authority (PPA), the Accra Metropolitan Assembly (AMA), Parliament of Ghana, Environmental Protection Agency, Ministry of Roads and Highways and any other Local Government areas the train will pass through.

But due to the outbreak of the coronavirus and subsequent border closures in South Africa and Ghana, the investors have not been able to visit Ghana at the time they had planned to do so to undertake the final feasibility study.


Also, contrary to media reports, neither the Minister of Railways Joe Ghartey, nor the Ministry of Railways Development, has said that the project would be completed by August 2020.


During the signing ceremony as part of the African Investment Forum’s Invest in Africa’s Space event in Johannesburg, South Africa, Mr Ghartey clearly admitted that there were lots of work to be done before the Sky Train Project can become a reality.


The Minister in recent weeks, had expressed worry about the delay of the project caused by coronavirus.


He has pointed out his strong desire to have the South Africans visit Ghana and have the final feasibility study conducted to get work started on the project.


He continues to pray for the pandemic to be brought under control to allow borders to reopen so that the South African Investors can visit Ghana.


The Ministry has therefore appealed to the general public to disregard reports suggesting that the project is a fiasco.


It assured that the South Africans will visit Ghana once borders are reopened so that they can complete the final feasibility study before the necessary approvals from PPA, Parliament, AMA, Ministry of Roads and Highways, and the Environmental Protection Agency can be obtained.


Based on the preliminary work, the Concession agreement was signed in November 2019 which will enable the investors do more work to bring up the engineering design and the exact cost of the project, among others.


Based on the report from the feasibility study, the Railways Minister would seek parliamentary approval for the project.


The investors and the Ministry are considering undertaking a post COVID-19 assessment of the project.


The signing of the concession agreement was between the Government of Ghana and AiSky Train Consortium of South Africa.

By:Isaac Clottey

Recommended for you